This 25-unit condominium faced critical foundation and timber pile failures, necessitating a complete rebuild of the foundation. To support the process, the structure was carefully suspended while the superstructure was fully reconstructed. The project also included a comprehensive update of the electrical and plumbing systems, along with a complete overhaul of the interior and exterior finishes, bringing the building up to modern construction standards and ensuring its long-term stability and functionality.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Schedule an Estimate Today